ACI / Work / Layout 3 Mockup
Project Ledger
Every project as a row. No tiles, no popup. Click a row to read more without leaving the page.
-
Construction of an engineered gravity block wall and soldier pile wall.
-
Performing earthwork and underground UTILITY work for the harrison specialty care clinic. exporting 65,000+ tcy of dirt.
-
Construction of engineered log matrix’s to stabilize the existing channel and banks.
-
Improvement of the sidewalks, curb bulb-outs, crosswalks, rrfb’s, and illumination to improve pedestrian access.
-
Installation of three picnic shelters and two pedestrian shelters with lighting, shelter power, site furnishings, fencing, plantings, and new sidewalk throughout.
-
The scope of work includes pavement restoration along Rainier Street from Union Avenue to Puyallup Street, approximately 2,520 LF, and involves pavement grinding, subgrade restoration, paving, curb ramp replacement, utility grade adjustments, replacement of utility covers and lids, channelization, and traffic control.
-
27 Lot residential housing plat complete including erosion control, logging, clearing, site grading, sewer, storm drainage, water, JUT trenching, streets, sidewalks, frontage improvements, lighting.
-
Asphalt overlay of runway and taxiway pavement, approximately 67,800SY of asphalt milling and 10,800TN of asphalt paving. Upgrade and replace runway edge lighting system. upgrade permanent signage along runway and taxiways. install new runway and taxiway pavement markings per faa standards.
-
This Contract provides for the improvement of two culverts located in Price Road and Brentwood Drive by replacing them with precast concrete voided slab girder bridges. The work includes, but is not limited to, temporary traffic control, temporary stream diversion, demolition, removal of the existing culverts and structure and obstructions, temporary access road, grading, concrete […]
-
Project provides for sitework that includes the following: erosion control, demolition, clear / grub, excavation / embankment, retaining walls, storm drainage, sanitary sewer, water distribution, road / sidewalk improvements, site lighting, monuments, stripe / sign, and irrigation services.
-
Project provides for the installation of 12,000 LF of 4-inch, 8-inch and 12-inch water main, 12,400 LF of 8-inch sewer main and 1,700 LF stormwater main throughout the west half (Phase II) of Capitol City Golf Club Estates from 66th Ave SE to Yelm Highway SE. Work includes water and sewer service lines, meters, valves, […]
-
The project provided for the improvement of the Maury Island Open Space Property (often referred to as the Maury Island Natural Area) located at approximately 7911 SW 260th Street in Vashon Island in King County. This property is under Washington Department of Ecology Agreed Order 8439, to clean-up soil contamination caused by Asarco’s Tacoma Smelter. […]
-
Construction of the Upper Nisqually and Mt. Rainier Retrofit. This contract provides for the construction of roughness elements within the channel that will help protect the levee and revetment structures from the damaging high energy flows.
-
Convert gravel existing gravel parking lot to a paved parking lot with new lighting system, storm sewer, irrigation, and landscaping.
-
ACI provided construction of a modern roundabout. The scope of the work included; storm water, water, sewer, flashing beacons, illumination, landscaping and other work.
-
The work to be performed under this contract includes furnishing the necessary labor, materials, equipment, tools and guarantees thereof to: construct curbs, gutters, planter strips, sidewalks, concrete walls, bike lanes, storm drainage improvements, paving, landscaping, irrigation, traffic signal modifications, and streetlights from Bridgeport Way to Cirque Drive.
-
This project is a development of a 16.13 acre parcel for construction of 288 new multifamily residential units. aci will perform tesc, clearing & grubbing, earthwork, grading, footing excavation & back-fill, storm & roof drains, water & sewer utilities and demo & grading at row.
-
Major work items include: Pulverizing Existing Asphalt Pavement, 22,000 SY; Precast Reinf. Conc. Box Culvert; Crushed Surfacing Base Course, 11,300 Ton; HMA CL. ½ in PG 58H-22 Fiber Reinforced, 5,500 Ton; Schedule A Storm Sewer Pipe, 5,475 LF; Water Main, 5,830 LF; Force Main Sewer Pipe, 5,800 LF; Illumination System; Roundabout Construction.
-
This project provides for, but is not limited to: The construction of approximately 1,640 linear feet of concrete traffic curb and gutter, 750 tons of HMA, Fiber Reinforced, 7,700 tons of Roadway Ex. and Embankment Compaction (measured per ton of CSBC), 950 square yards of planing, 599 linear feet of storm pipe, 700 square yard […]
-
Construction of approximately 1,500 linear feet of discontinuous setback revetment involving excavation, Logs, slash and Concrete Dolos.
-
Demolition of existing site infrastructure and construction of new Parking lot, concrete walkways, pavement markings, water and sewer mains and services, stormwater infrastructure, landscaping, irrigation, and illumination.
-
This project included the removal of an aging 10’ diameter steel culvert over Erick Creek on Abernathy Creek Road and replacing it with a Multi Plate Steel Arch Culvert with cast in place stemwalls, wingwalls and headwalls. Other critical elements of the project included installation of a stream bypass , restoration of the original streambed […]
-
Project provides for the construction of sidewalk, retaining wall, illumination, and compact roundabout improvements.
-
Project provides for the reconstruction of approximately 3000 feet of College Street and 22nd Avenue to include a modern roundabout, private utilities joint trench, water, sewer, stormwater, traffic signal, flashing beacons, illumination, modern roundabout to include; stormwater, water, sewer, flashing beacons, illumination, and landscaping.
-
Street reconstruction of Homann Dr. including road removal and new installation of new storm drainage improvements, sidewalks, ADA curb ramps, driveways, curb & gutter, adjusting utility appurtenances, and striping. Work also includes asphalt overlay at the Pacific Ave/Homann Roundabout and installation of new striping and two sharrow routes inside city limits.
-
Project provides for the construction of a two-lane roundabout at the intersection of 4th Avenue S and Willis Street (SR 516). The project also includes new storm drainage, illumination, decorative sidewalks and other streetscape amenities.
-
Remove dip in asphalt pavement at Lakemont Blvd and Golf Club Road, replace with CSBC, Geogrid, and new asphalt. Remove asphalt and install layers of Geofoam blocks and pave over with new asphalt at Lakemont Blvd and 164th Ave. Install new water main, channelization, and a mini-roundabout at 164th Ave and Newport Way.
-
Project provides for the improvement of Stowell Road MP 0.57 by performing temporary BMPs, stream diversion, structure excavation, concrete slope protection (precast concrete units), re-setting existing riprap, streambed gravel, large woody debris, hydrodseeding and other work.
-
Emergency Vehicle Operations Course drive paving repairs to the north and south course at the Washington State Patrol facility. This 2.1 million dollar project was finished in 30 calendar days.
Awards
- WAPA Paving Award – Emergency Vehicle Operations Course (WPS) (2017)
-
Construct the Tremont Street from State Route 16 to port orchard boulevard. the project consists of constructing new widened roadways, medians, bike lanes, planting strips, sidewalks, and roundabouts along tremont street at the intersections with south kitsap boulevard and pottery avenue. this work includes storm drainage piping, structures, and vaults; new water mains, service lines, […]
Awards
- APWA Project of the Year Award – Transportation $5M to $25M – Tremont Street Widening (2021)
-
Project provides for planing, paving and channelization of College St SE from Mullen Rd SE to Rainier Rd SE and Yelm Highway SE from City limit lines on the west to Ruddell Rd SE to include; ADA curb ramps, median construction, flashing beacons, illumination, landscaping, and irrigation.
-
140 Lot residential housing plat complete including erosion control, site grading, retaining walls, sewer, storm drainage, water, JUT trenching, streets, sidewalks, lighting.
-
This project replaced a 100-foot section of 48-inch diameter corrugated metal pipe culvert with an 8-foot-wide reinforced concrete box culvert and placing natural streambed features within the box culvert.
-
This Contract provides for the improvement of the existing culverts at 54th Avenue East and 8th Street East by replacing the existing twin 68-inch culverts with a box culvert, including reconstruction of 54th Avenue East and 8th Street East in the vicinity of the culvert crossing, including utility coordination, and the replacement of the culverts […]
-
The work required by the contract plans and specifications shall include, but is not limited to, all work as generally described: Orville Road Engineered Log Jam Setback Revetment Phase 2C Year 2, Project 1425: The work includes but is not limited to the following items of work, improvements along the left bank of the Puyallup […]
-
Road improvements on 66th Avenue from approximately 20th Street to 26th Street; offsite stormwater and parking improvements including grading, surfacing, paving, stormwater, water, illumination, curb, gutter, sidewalk, striping, signing, and traffic control. All work shall be in accordance with the Contract Documents, City of Fife Standards, and WSDOT 2016 Standard Specifications.
-
The project consists of raising the existing road slump by digging out the failing pavement and rebuilding the roadway section. The driveway, sidewalk, curb and gutter will also be removed and raised to finished grade. 120’ of storm sewer pipe and a catch basin will be removed and replaced. 110’ of 8” diamter waterline will […]
-
Mass excavation, Site Grading, and utilities for 2 commercial buildings in downtown Tacoma.
-
Civil excavation, for building foundations, water, fire, sewer and storm services. ACI installed the domestic water and underground fire systems, as well as the sanitary sewer and storm drainage systems to the buildings. The Martin Way Senior Living Project is a 154,831 sq. site that includes, 135 apartments, 2 suites for guests, and a beautiful […]
-
Repair of existing culverts and STREAM-BEDS including selective pruning and clearing, STREAM-BED grading, STREAM-BED sediment, STREAM-BED cobbles, STREAM-BED boulders, installation and removal of temporary stream diversion systems, erosion and water pollution control, planting RESTORATION, traffic control.
-
Construction of a transit center/hub for Expedia Group which involved demolition of an existing building/concrete/asphalt and installing new utilities, new concrete drive lanes, and a modular building.
-
RESIDENTIAL SITE DEVELOPMENT OF 174 loTS – clearing, tesc, earthwork, sewer, storm, water, retaining wall, asphalt, concrete, electrical, striping, signs
-
Install quarry spalls at the base of an eroded slope and extend existing storm drainage to prevent any future erosion on a steep slope. Place native soil and gravel borrow to cover quarry spalls, and place erosion control BMPs protect new and existing soil.
-
Replaced a deteriorated asphalt skid pan with a 40,000SF polished concrete slab. Only a handful of skid pans this size existing in the entire US. This facility is booked 300+ days/year by agencies from Washington, Oregon, Idaho, Montana and Hawaii..
-
Repair and Improve the existing access road that had settled overtime. Major items of work included: Pulverize Existing Asphalt Pavement, 10,350 SY; Roadway Excavation Incl Haul, 1,700 CY; Crushed Surfacing Base Course, 3,600 Tons; HMA Cl 1/2 In PG 58-22, 2,750 Tons; Electrical and Illumination System
-
The improvements will include construction of 675 feet of new roadway from 228th Avenue SE/228th Place SE to the SE 231st Street improvements constructed by MV Logistics and intersection improvements at the 228th Place SE/228th Avenue SE and SE 238th Street/228th Avenue SE intersections.
-
This contract provides for the construction of: a concrete basketball court, precast concrete bicycle pump track, concrete curb, gutter and sidewalk, community garden, off-leash dog area, riparian planting, irrigation, wood, and chainlink fencing at Springbrook Park.
-
The work consists of removing an existing rock armored levee, construction of a new levee setback with biorevetment scour protection. Work also includes excavation of a floodplain side channel, installation of 100+ engineered log jams (ELJ) in the floodplain and river channel, constructing an overflow culvert under the roadway, Landscaping Guardrail and Restoration. Major components […]
-
Project includes development of associated athletic fields, student parking, bus parking and circulation, visitor parking, site access roads and miscellaneous site amenities. ACI has also had offsite work making utilities tie in connection, roads improvements, adding access roads and work on new roundabouts. The completed project will be the largest high school in Washington State, […]
-
Construct a roundabout at the intersection of boulevard road se and morse-merryman road se. work included clearing and grubbing, pavement removal, road widening and grading, compaction, cement concrete curb and sidewalk, storm-water conveyance and storm-water treatment facility, replacement of asbestos cement water main, joint utility trench excavation and conduit INSTALLATION, private utility conversions, illumination system, […]
Awards
- Public Works Project of the Year Award – Blvd Rd & Morse-Merryman Rd Roundabout (2020)
-
Improvement of the County Road Cloquallum Road MP 5.85 – MP 6.60 located in Mason County, by clearing and grubbing, removal of bituminous pavement, ditch excavation, roadway excavation, embankment compaction, schedule A culvert pipe, select borrow, quarry spalls, CSBC, CSTC, HMA, seeding, fertilizing, mulching, plastic covering, paint line, and beam guardrail type 31.
-
79 lot residential housing plat complete including logging, clearing, erosion control, site grading, retaining walls, sewer, storm drainage, water, JUT trenching, streets, sidewalks, lighting, frontage improvements along with site grading for 43 future phase building lots.
-
Construction of a new roundabout including install of storm, JUT, and a new WATER MAIN.
-
Project provides for resurfacing of City streets consisting of approximately 10,250 tons of hot mix asphalt, 26,000 square yards of chip seal, 2,200 tons of crushed surfacing, 54,000 square yards of planing bituminous pavement, 44,250 square yards of pavement reinforcement interlayer, 1,790 square yards of cement concrete sidewalk and curb ramps, traffic signal work, clean-up […]
-
This project consisted of the installation of 16 Apex Engineered Logs Jams and 11 Side Channel Roughness Engineered Log Jams along the channel of Yellowjacket Creek near the confluence of the Yellowjacket and Cispus River. This included installing timber piles to stabilize each of the ELJ’s, along with channel grading.
-
Installation of approximately 1,600 linear feet of concrete traffic curb & gutter, 230 linear feet of concrete traffic curb, 1,120 square yards of concrete sidewalk, 5,000 tons of hma, 28,000 square yards of pavement planing, 1,200 square yards of raodway repair, 1,900 tons of csbc, 6,780 square feet of gravity block wall, 708 linear feet […]
-
This project consists of pavement and concrete flatwork removal, cement concrete curb and sidewalk installation, signal system upgrades, asphalt pavement planing, HMA overlay, channelization, landscaping, and other work, all in accordance with the Contract.
-
Improvement of Logan Hill Road by removing a fish barrier and constructing a stream bypass, structure excavation, constructing a new precast culvert, anchored large woody debris, re-aligning Berwick Creek, planting mitigation, crushed surfacing, guardrail, and asphalt.
-
Contract consisted of improvements of Kitsap Way (SR 310) and Warren/Wheaton Avenue (SR 303) pavement markings, ADA ramps demolition and reconstruction, removal and replacement of traffic signal heads, installation bicycle signal detection, installation of illuminated street signs on existing signal arms, and traffic control.
-
This Contract provides for the improvement and/or the construction of bike lanes, ADA-compliant curb ramps, pedestrian refuge islands, pedestrian crossings and midblock crossings, bicycle signal detection and APS, HAWK beacon system, electrical duct bank, 5500’ of 12” water main, sewer main replacement, stormwater upgrades, and grind and overlay.
-
Excavation of new Boise Creek and Chappel Springs stream channel segments, construction of an earthen embankment, installation of engineered log structures, construction of three new permanent bridge crossings, invasive species control and riparian planting restoration work, fish exclusion, golf course irrigation system preservation and restoration, golf course green and tee box restoration, construction of new […]
-
Construction of street improvements within the right-of-way of 216th Avenue SE (approximately 3,300 LF), including removal of existing pavement, sidewalk, and curb. Constructing new pavement, curb, gutter, sidewalk, planter strips, sidewalks, retaining walls, illumination, storm drain system, undergrounding utilities, franchise utility trench, and landscaping
-
Sidewalks on both sides of the street with buffer strips; raised intersections; crosswalks and ADA ramps; illumination; storm drainage, utility adjustments, utility relocations, cement concrete driveways, HMA driveways, landscape, irrigation.
-
Project provides for the construction of a new culvert, creek channel, and habitat features.
-
This project provides for the improvement of 55th Avenue and the Bingamon Creek Culvert in King County by clearing and grubbing, grading, surfacing, paving with HMA, culvert excavation, providing and installing a precast concrete box culvert, retaining wall excavation, installing structural earth retaining walls, channel excavation, relocating a tributary stream, erosion control, seeding and mulching, […]
-
This project consists of the creation of wetland along the Cedar River. The Work required to complete this project includes installing and maintaining temporary erosion and sediment control facilities; providing temporary traffic control; removing noxious weeds; clearing and grubbing; removing garbage and miscellaneous abandoned infrastructure from the Site; tree salvage; installing and maintaining temporary de-watering […]
-
Project provides for the construction of a roundabout at the intersection of SR 510 and Meridian Rd SE in Thurston County to reduce the frequency and severity of collisions and improve motorist safety. Additional work will consist of HMA inlay of the existing lanes on SR 510. Work activities include clearing and grubbing, roadway excavation […]
-
Work includes installation of new storm drainage, and removal and replacement of roadway intersection corners and sidewalk to comply with current ADA regulations including new curb, sidewalk, asphalt pavement and illumination.
-
This pedestrian improvement project on the east side of Burnham Drive in Gig Harbor WA. The project included clearing and grubbing as well as utility relocation to accomplish widening of the road section with bike lane and cement concrete curb, gutter, sidewalk and driveways. The project includes cast in place concrete retaining walls, installation of […]
-
79 lot residential housing plat complete including logging, clearing, erosion control, site grading, sewer, storm drainage, water, JUT trenching, streets, sidewalk, lighting along with site grading for 87 future phase building lots.
-
1.01 miles of US 101, MP 251.65 to MP 252.66; and 5.82 miles of US 101, MP 256.55 to MP 262.37 during daytime and nighttime work hours in Clallam County by performing roadway excavation, installing drainage structures and concrete storm sewer pipe, placing crushed surfacing base course, performing HMA paving, performing HMA pavement repair, installing […]
-
Construction of new roadway and roundabout, sidewalk, illumination, storm system with ponds, 24” water main, sewer main, and conversion of overhead to underground utilities.
-
Utility and Earthwork. Complete and comprehensive execution of the Site Demolition. Clearing & Grading. Temporary Construction. TESC & SWPPP. Site Grading, Site Coordination. Excavation, Backfill & Grading, Structural Excavation. Utilities (Site Work & Utilities) and related work and services.
-
Improvement of the intersection of I-5 SB Ramp at tumwater boulevard to add a left-turn lane and traffic signal upgrade.
-
4100 lineal feet of 12-inch HDPE sewer force main, approx. 4200 lineal feet of 2-inch and 3-inch lower pressure sewer in the City right-of-way, approx. 1160 lineal feet of 12-inch storm sewer, approx. 200 feet of 16-inch HDPE gravity sewer, demolition, abandonment of beach sewer laterals in place, grading, hot mix asphalt, cement concrete sidewalks, […]
Awards
- NUCA Contractor of the Year – Project Over $2M – Oyster Bay Beach Sewer Upgrades (2023)
-
Construction of approximately 2,000 feet of setback revetment near the left bank of the Puyallup River between RM 27.8-28.2. The revetment consisted of a series of precast concrete units (aka do lo) combined with a series of logs.
-
Construction of new sidewalk on Wildwood Park Drive between 31st Ave SE and 26th Ave SE including construction of new stormwater infrastructure, paving, lighting system interconnect, and RRFB pedestrian crossing.
-
Project provides for excavation, pavement removal, grading, cement concrete curb and gutter, cement concrete sidewalks, driveways, storm system improvements, soldier pile walls, pedestrian railing, beam guardrail, rockeries, street lighting, electrical conduit and vaults, asphalt paving, planing, asphalt overlay, landscape restoration, channelization, and traffic control.
-
Improve former railroad bank between the Issaquah/Sammamish city limit and Southeast 33rd Street. Work includes removal of existing gravel trail and construction of approx 1.3 miles of 12′ wide paved trail with gravel shoulders, concrete driveway crossings, and stream mitigation planting. Other items of work include erosion control, site preparation, grading, structural earth wall, fencing, […]